Loop 1
Loop 1
Along the way
- 18 June 2026 - 10:47 · Singapore
- Pang Sua Park Connector · Singapore
- Down to Zhenghua Park Connector · Singapore
- Zhenghua Park · Singapore
- Turns to unpaved trail · Singapore
- Single track · Singapore
- Swallow nests under the bridge · Singapore
- Good rocky trail · Singapore
- Follow PUB infrastructure · Singapore
- End of the trail: onto Rifle Range Road · Singapore
- Connector to Rail Corridor · Singapore
- Rail Corridor · Singapore
- Hindered Bridge · Singapore
- Upper Bukit Timah Truss Bridge · Singapore
- Rail Corridor · Singapore
- Pang Sua Park Connector · Singapore